https://bio.site/dapurtoto1

https://linkr.bio/dapurtogel

https://heylink.me/dapurtoto88/

https://bio.site/dapurto88

https://potofu.me/dapurtoto88

toto togel 4d

situs togel

10 situs togel terpercaya

10 situs togel terpercaya

situs toto

bandar togel online

10 situs togel terpercaya

toto togel

toto togel

situs togel

situs togel

situs togel

situs togel

bandar togel

situs togel

bo togel terpercaya

situs togel

situs toto

toto togel

situs togel

situs togel

situs toto

situs togel

https://www.eksplorasilea.com/

https://ukinvestorshow.com

https://milky-holmes-unit.com

toto togel

situs togel

slot online

Total To Develop OML 130 With $15 billion

1 Min Read
Total

French oil major, Total has revealed its intention to develop the offshore Egina field for $15 billion as part of a plan to boost production.

First oil from the field, which is part of the OML 130 block, is expected at the end of 2017, with output reaching 200,000 barrels of oil a day, according to a statement.

The project can be started after Total obtained the necessary approvals from Nigeria to award the main contracts, the statement showed.

Total Chief Executive Officer Christophe de Margerie has said the explorer will use proceeds from asset sales to pay dividends and develop oil and gas projects rather than make acquisitions. The French company has also pledged to try harder to make large oil and gas discoveries in a bid to raise production.

The Egina project calls for 44 wells connected to a 330 meter-long floating production, storage and offloading vessel which can store 2.3 million barrels, Total said in today’s statement. Locally worked hours will reach about 75 percent for Egina as part of a plan to boost local content of Nigerian projects.

 

[Bloomberg]

Share this Article