toto slot

toto togel 4d

situs togel

10 situs togel terpercaya

situs togel

10 situs togel terpercaya

link togel

situs toto

situs togel terpercaya

bandar togel online

10 situs togel terpercaya

bo togel terpercaya

bo togel terpercaya

10 situs togel terpercaya

situs toto

https://rejoasri-desa.id

https://www.eksplorasilea.com/

https://ukinvestorshow.com

https://advisorfinancialservices.com

https://milky-holmes-unit.com

RTP SLOT MAXWIN

Fashola Bans Commercial Activities Under Marine Beach Bridge

4 Min Read
Fashola

 

 

The Minister of Works and Housing, Mr Babatunde Fashola on Thursday banned commercial activities under the Marine Beach Bridge as rehabilitation works are completed for the bridge to reopen to traffic.

Fashola while inspecting the bridge instructed ministry officials to adopt measures against street trading that sparked up the fire that destroyed the bridges several years ago leading to its degeneration.

Fashola said that construction works on the Apapa Bound Lane under construction was completed and the section would be opened to traffic “in a few days’’.

While inspecting ongoing construction on the Apapa bound lane on the top of the bridge, the contractors on the project explained that work was ongoing beneath the bridges while vehicles plied the top.

The minister commended the level of technology being applied while assessing the work done warned against allowing illegal activities under the bridge.

READ ALSO: Minister Inaugurates Committee on COVID-19 Palliatives for Rural Communities

Fashola commended the contractors for the repairs without closure of the bridge.

“You have to ensure no trading or illegal activities take place here again, in the first place that was what caused the fire that damaged this bridge,’’ he directed his officials.

He appealed to residents and other stakeholders in Ijora and Apapa to desist from abuse of the bridges that caused the damage of the bridge.

The Federal Controller of Works in Lagos, Mr Olukayode Popoola explained that repair works on the bridge were 100 per cent completed.

He said 10 expansion joints and about 60 bearings were changed on a stretch of about 250 metres completing the work to asphalt stage.

He added that Jacketing of the piers that are, lifting the bridge to work underneath was completed.

Mr Kaadi Ghassan, project manager, Buildwell Plants and Equipment Industries Ltd., contractors on the project explained that by Monday the work underneath would be completed for the bridges to be re-opened to traffic.

He explained that special kinds of keys were used to hold the Apapa bound lane under construction bridge firmly in place for work to continue on both surfaces and underneath without affecting traffic flow.

Ghassan said that materials for the rehabilitation of the Ijora bound lane were being expected before the end of October and until they arrived the section would not be closed.

“I don’t want to rush to close the other section when the bearings and expansion joints arrive, we will close to do the work,’’ he said.

NAN reports that the over 40-year-old Marine Beach Bridges was damaged by a fire incident and was first awarded for repairs in 2012.

It went through another round of six months repairs in 2017, before the current ongoing rehabilitation that began in phases in 2020 with the entire repairs expected to be completed in March 2021.

Share this Article