toto slot

toto togel 4d

situs togel

10 situs togel terpercaya

situs togel

10 situs togel terpercaya

link togel

situs toto

situs togel terpercaya

bandar togel online

10 situs togel terpercaya

bo togel terpercaya

bo togel terpercaya

10 situs togel terpercaya

situs toto

https://rejoasri-desa.id

https://www.eksplorasilea.com/

https://ukinvestorshow.com

https://advisorfinancialservices.com

https://milky-holmes-unit.com

RTP SLOT MAXWIN

Renovation of Jos Airport 95% Completed

2 Min Read

 

The renovation work on the Jos Airport is 95 percent completed, the Airport’s Manager,  Mr Ayinla Olufemi, has said.

Olufemi told News Agency of Nigeria (NAN) on Sunday in Jos that the project when completed would give the airport a facelift and attract more airlines and passengers to it.

He said that the contractors handling the work had returned to the site after the lockdown necessitated by the COVID-19 pandemic.

He said that the renovation work included paintings, roofing, tiling, and provision of additional facilities.

The manager said that facilities such as conveyor belt, sensor taps, soap dispensers, and hand dryers would be installed, adding that it was necessary to ensure a reliable system for social distancing amid the Coronavirus pandemic.

READ ALSO: Police vow showdown with NLC, TUC over planned strike

“We have installed sensor taps, hand dryers, and sanitizers in all the toilets, already, but the conveyor belt will be installed soon, ” he said.

We have also marked the floor to ensure social distancing to maintain up to two-meter space between passengers,” he said.

Olufemi said that the recent signing of the Memorandum of Understanding (MoU) between the Plateau Government and MaxAir for commercial flight operations between Jos and Abuja would give passengers a faster and easier connection and further open up the airport.

He, therefore, advised passengers to comply with all safety measures and help to maintain the facilities made available.

Share this Article