toto slot

toto togel 4d

situs togel

10 situs togel terpercaya

situs togel

10 situs togel terpercaya

link togel

situs toto

situs togel terpercaya

bandar togel online

10 situs togel terpercaya

bo togel terpercaya

bo togel terpercaya

10 situs togel terpercaya

situs toto

situs togel

https://rejoasri-desa.id

https://www.eksplorasilea.com/

https://ukinvestorshow.com

https://advisorfinancialservices.com

https://milky-holmes-unit.com

RTP SLOT MAXWIN

FERMA begins rehabilitation of Alapere/Old Toll Gate Road in Lagos

2 Min Read

The Federal Roads Maintenance Agency (FERMA) has begun filling of critical portions of the Alapere/Old Toll Gate Road on the Lagos-Ibadan Expressway.

A correspondent of the News Agency of Nigeria (NAN), who visited the site on Monday, reports that FERMA is laying asphalt on the Ibadan-bound carriageway from the Ketu Junction to the Old Toll Gate Bus Stop.

FERMA had deployed men and machines including asphalt-paving machines and rollers on the outer lane of the road.

A source in the agency told NAN on condition of anonymity that FERMA moved to site on Tuesday to lay asphalt on various sections of the road, beginning from Alapere.

 

 

Mr Tayo Awodu, a FERMA engineer in charge of the project, said that the agency was working on distressed portions of the highway.

“We are filling distressed portions of the pavement and overlaying them with asphalt.

“We have evolved a new plan to finish the work this month if all things work out according to plans.’’

He noted that heavy vehicular traffic was a major challenge to construction in Lagos, saying that the company was working at night to speed up work.

NAN reports that the road project was awarded to MJD Ventures in November 2016. It was scheduled to be completed by May. (NAN)

TAGGED: , ,
Share this Article