toto slot

toto togel 4d

situs togel

10 situs togel terpercaya

situs togel

10 situs togel terpercaya

link togel

situs toto

situs togel terpercaya

bandar togel online

10 situs togel terpercaya

bo togel terpercaya

bo togel terpercaya

10 situs togel terpercaya

situs toto

situs togel

https://rejoasri-desa.id

https://www.eksplorasilea.com/

https://ukinvestorshow.com

https://advisorfinancialservices.com

https://milky-holmes-unit.com

RTP SLOT MAXWIN

Spirits Collected Money From Us to Complete Power Project- Fashola

3 Min Read

Minister of Power, Works and Housing, Babatunde Raji Fashola expressed that electricity challenges in Nigeria are manmade which will soon be surmounted.

The Former Governor of Lagos state disclosed this in Lagos during the maiden edition of Made in Nigeria Festival at Eko Atlantic.

Fashola said with his blueprint is in three phases: power-generation, steady supply of power and uninterrupted power supply which when fully actualized will bring an end to power problem in the country.

The minister said “We had an issue some time ago during an electrification project, we got to this expanse of land and we were told that the land where we need to lay electricity cables belongs to the spirit, the indigenes of that area scared the contractors away by invoking curses on the project. I was briefed about this and we entered into negotiations with them, you won’t believe this, by the time we finished the negotiation, the ‘spirits’ collected money and we were able to continue with our project.

“Another instance was where we had a telecommunication mast obstructing electrification of a village, the former regime and the telecommunication company were exchanging letters, all I did was call Otunba Mike Adenuga and the mast was removed in a week.

“The power challenges are not impossible, most of them are man-made, I am determined to ensure we get to the point where Nigeria has uninterrupted power supply”.

He furthered that “We have never generated up to 5000 megawatts of power since 1960 but we generated 5,074 megawatts of power in February 2016 and this was made possible because we have begun systematic repair of our power-generating equipment which is in the phase one of our developmental plans”.

Fashola disclosed that he and his team has a developmental plan consisting of power generation which is focused on maximising all available power-generating components by repairing them. The second phase is steady supply of power while the third phase is uninterrupted power supply.

Fashola reiterated the government’s resolve to get electricity to the rural areas by engaging universities located in rural areas.

“We are deepening rural electricity, we are using universities as anchors for these rural areas. These universities are located in the rural areas. In the universities where we are carrying out this rural electrification programmes, we are challenging the students in Electrical Engineering Departments to develop a power plan to add to what we have on ground already before they graduate from that university,’’he concluded.

Share this Article